In 2004, in anticipation of a U.S. Environmental Protection Agency (EPA) Consent Decree, the Knoxville Utilities Board (KUB) was faced with the need for a wastewater collection system improvement program to reduce the occurrence of sanitary sewer overflows, increase wastewater collection system capacity, and improve surface water quality in Knoxville.

In order to reduce the occurrence of Knoxville’s sewer system overflows, Gresham Smith joined KUB’s PACE 10 Program to provide project management, design and construction phase services for six wastewater equalization basins. The basins are a key component of the 10-year, $530 million overflow reduction program, and range in size from 3.25 to 9.0 mg. Gresham Smith provided overall project management and site suitability studies on each site and has played a major role in the conceptual and final designs of all six basins.

The basins, at an approximate cost of $83 million, were designed and constructed on an expedited project schedule. Each equalization basin includes a circular or rectangular reinforced concrete basin, pumping station using submersible pumps, flow diversion structure, odor control systems designed for intermittent operation, and grinder screens.

10
year overflow reduction program
6
equalization basins
1
expedited schedule
Exterior view of Upper First Creek Basin Pump Station.

Upper First Creek Basin

Basin Size: 9.0 mg rectangular below-grade, cast-in-place concrete basin
Pump Station: 14.0 mgd
Operation: Combination gravity and pump fill and drain
Lower First Creek Basin

Exterior view of above-grade circular, prestressed concrete basin at Lower First Creek Basin Pump Station.

Lower First Creek Basin

Basin Size: 5.0 mg above-grade circular prestressed concrete basin
Pump Station: 14.0 mgd
Operation: Pump to fill and gravity drain

Aerial view of circular, pre-stressed concrete equalization basin at Fourth Creek/Walker Springs Pump Station.

Fourth Creek/Walker Springs Basin

Basin Size: 3.25 mg above-grade circular prestressed concrete basin
Pump Station: 15.0 mgd
Operation: Pump to fill and gravity drain

Aerial view of Third Creek Offline Wastewater Storage Facility.

Third Creek Basin

Basin Size: 4.0 mg above-grade circular prestressed concrete basin
Pump Station: 6.0 mgd
Operation: Pump to fill and gravity drain

Exterior view of below-grade, prestressed concrete basin at Second Creek Basin Pump Station.

Second Creek Basin

Basin Size: 5.5 mg below-grade prestressed concrete basin
Pump Station: 25-mgd
Operation: Combination gravity and pump fill and drain

Exterior view of partially above-grade cast-in-place basin at Lower Third Creek Basin Pump Station.

Lower Third Creek Basin

Basin Size: 6.5 mg partially above-grade basin, cast-in-place
Pump Station: 30-mgd
Operation: Pump to fill and gravity drain