Finding the Root of the Problem
Our team ran a variety of tests on the building’s heating water system and chilled water system, ultimately discovering that the systems had not been programmed properly. Therefore, small changes in load or occupancy meant big changes in water temperature and water flow. We also discovered that a few tanks were installed incorrectly, which contributed to the operational issues.
Getting Up to Par
Once we identified the mechanical issues, we made the necessary changes to the systems. By changing the setpoints on the chilled water system and hot water system, we corrected the shutoff issues. We also updated the building automation and controls system to make sure the systems were communicating properly.
Elevating the Patient Experience
The improvements to the medical clinic’s mechanical system improved the building’s operational efficiency, creating a comfortable space and improving air quality for patients, visitors and staff.